Case Study

£150,000 Left on the Table

A hotel refurbishment included major qualifying plant works, but a Section 25 oversight left significant allowances unclaimed.

Overview

A hotel owner carried out a major refurbishment including a new heating system, air conditioning, and lighting upgrades. The accountant identified core qualifying plant and machinery, but missed a substantial additional claim under Section 25 of CAA 2001.

What happened?

The core systems were captured, but related enabling works were omitted.

  • Rewiring and pipework required to install the qualifying systems were excluded.
  • Ceiling and wall modifications needed to accommodate installations were not claimed.
  • Temporary access works undertaken to deliver qualifying items were overlooked.

What was missed?

Section 25 can allow incidental construction work to qualify when it supports qualifying plant activity.

How a CA Specialist would have prevented this

A technical survey led review would have captured the full qualifying scope.

  • Formal site survey: Assessed all works completed, not just ledger descriptions.
  • Incidental works mapping: Linked construction activities to qualifying plant and machinery.
  • Correct categorisation: Allocated costs under the correct Capital Allowances treatment.
  • Improved claim outcome: Increased the claim materially by recognising the missed £150,000.

Key lesson

An accountant alone may not have the construction knowledge to identify every qualifying expense.

Discuss your portfolio with a specialist.

Secure an initial technical review of your property assets or upcoming construction project.